Guardian Artificial Slate

£50.39

 
 
 
Feefo logo
|
Industry Experts

50 Years Experience

|
Finance Available

Spread the Cost

Tablet

Mobile

  

Feefo logo
|
Industry Experts

50 Years Experience

|
Finance Available

Spread the Cost

UKFR Inverse Logo.png
Feefo logo
Industry Experts

50 Years Experience

Finance Available

Spread the Cost

 
 

Guardian Artificial Slate

£50.39

inc. VAT

£50.39 (inc. VAT)   £41.99 (ex. VAT)

Guardian Artificial Slate

£50.39 (inc. VAT)   £41.99 (ex. VAT)

£50.39

Ex VAT

Inc VAT Price Per m2:

Ex VAT Price Per m2:

Black Brown Grey Mulberry Terracotta
445 x 294mm
0.675kg
Two 30mm x 4mm head stainless steel screws (Not Supplied)
90
14
12mm or standard roofing batten
22 Slates per Pack
SKU: 1050030015

  ClassicBond EPDM Roof Kit Calculator

  SkyGuard EPDM Shed Roof Kit Calculator

 Same Day Dispatch - 1 - 3 Working Days Delivery

 1 to 5 Working Day Delivery

 Same Day Dispatch - 2 - 4 Working Days Delivery

 2 to 10 Working Day Delivery (Insulation Delivery)

 Free delivery on some insulation orders*

 1 to 2 Working Days (Tuesday - Friday Delivery Only)

 2 - 5 Working Days Delivery

 2 - 5 Working Days Delivery

 2 - 5 Working Days Delivery

 2 - 5 Working Days Delivery

 Same Day Dispatch - 1 - 4 Working Days Delivery

 1 - 5 Working Days Delivery on most fixings - (See Delivery Tab below)

 Free Delivery on Fixings orders over £200 ex. VAT*

 1 to 7 Working Days (UK Insulation Network)

 Free delivery over £350 ex VAT on some insulation orders*

 1 - 7 Working Days Delivery

  Same Day Dispatch - 2 - 5 Working Days Delivery

 Free delivery over £350 ex VAT on some insulation orders*

 1 to 2 Working Days (Tuesday - Friday Delivery Only)

 Free Delivery on GrufeKit orders over £400 ex. VAT

  3 - 4 Weeks Delivery due to Supply Chain Fire (Contact us for more details)

 Same Day Dispatch - 1 - 3 Working Days Delivery

 NOTE: Special Order Item - 7- 10 Working Days

 Manufacture Time - 7- 10 Working Days (Under 60sq.m) - Contact us for larger orders

 3 - 5 Working Days Delivery

 Free delivery over £800 ex VAT on rooflights*

 

Out of stock.

 

PayPal

PayPal Pay Later

           

20.000


Artificial Slate

Guardian Slate creates the effect of natural slate without the risk of cracking and breaking. They provide a smart alternative to traditional roof finishes that is lightweight, faster to install and cost effective.

The Ultimate Lightweight Slate Solution

Guardian Slate is an innovative roofing system featuring the aesthetic appeal of natural slate without the risk of cracking and breaking.

Today’s house builders and owners demand lower cost, faster and easier construction without compromising on quality while maintaining a traditional appearance.

Available in five natural colours

Guardian Slate is available in a choice of five natural colours, providing you the opportunity to add texture and style to your home.
The colours have been tested to high UV exposure and exhibit virtually no fade and with no trace of cracking or splitting.

Coverage - Each pack contains 22 slates per bundle

Roof Pitch Gauge Slates per sq.m
14* to 22.5 degrees (boarded only) 152mm 22
22.5 to 25 degrees (boarded or battens) 152mm 22
25 to 27.5 degrees (boarded or battens) 165mm 20
27.5 to 30 degrees (boarded or battens) 178mm 19
Above 30 degrees (boarded or battens) 191mm 18

 

Recycling
Guardian Slate is 100% recyclable, contact a local recycler to make the necessary arrangements, stating that the product is ‘mineral-filled Polypropylene’ plastic.

Fastener Recommendations
The Guardian Slate should be fastenened with two 30mm x 4mm head stainless steel screws.

Roof Decking Materials
Minimum of 12mm wpb plywood board, solid wood decking, or oriented strand board (OSB).

Roof Venting
Roof ventilation is necessary for the longevity of the roof system. Having a cool attic in the summer and a dry attic in the winter helps prevent damage to building materials and reduces energy consumption.

With a ventilation system split between the ridge and soffit, 0.09m2 of net free area is required for every 27.9m2 of attic floors space.

It is required to have 0.09m2 of ventilation for every 13.9m2 of attic floor space if this balance cannot be achieved.

Tools Required

  • Cordless drill or screwdriver
  • Sharp utility blade or standard circular saw
  • Tape measure
  • Pry bar
  • Tin snips
  • Blue chalk (do not use red chalk)

Product Information

Construction: Manufactured from resin bonded crushed limestone

Size:

  • Slate: 445 x 294mm
  • Ridge cap: 150 x 445mm

Weight:

  • Slate: 0.675 kgs (nominal)
  • Ridge cap: 0.620 kgs (nominal)

Ridge Coverage: 5.5 per linear metre

Hip Coverage: 5.5 to 6.5 per linear metre (depending on gauge)

Packaging: 22 slates per bundle (14.85 kg) / 1584 slates per pallet (1.04 tonne)

Roof Boarding: 12mm or standard roofing batten

Fixing: Two 30mm x 4mm head stainless steel screws

Cutting: Fine-toothed handsaw, jigsaw, circular saw, or sharp utility blade

Maximum pitch: 90 Degrees

Minimum pitch: 14 Degrees* (*Boarded Only)

Storage: Must be stored above 7°C for 24 hours before use. Can be installed at 0°C but must be hand fastened.

Warranty: Limited lifetime

Product Ratings and Certification

Hail rating: Class IV
Fire rating: A Rated to British Building Standards
Freeze-thaw cycle: No signs of damage or cracking after 300 cycles
Water absorption: No appreciable weight gain
Water permeation: Slate shown to be impermeable
Temperature cycling: No signs of cracking, curling, deformation, or visible expansion
BBA product certification: Pending

When do you dispatch orders?

If your order is placed before 12pm we aim to have these processed and dispatched on that same day. However some items have an earlier cut off time and will be dispatched the following day. 

How much will my delivery cost?

Our delivery costs vary depending on what product is ordered and where it is being delivered to. When you add items to your basket and proceed to checkout the delivery prices will be stated. We keep our delivery costs as low as possible and only pass on the rates that our delivery partners charge us.

How long will my delivery take?

On the product page you will see our usual lead time for our items, these are above the ADD TO BASKET button. These are a guide only and we aim to get your items delivered to you ASAP.

SPACING BETWEEN THE SLATES

To aid consistent spacing, 6mm spacer tabs are provided on each side of every slate.

The spacers allow for any movement of the roof deck and expansion / contraction of the slate (although thermal expansion is highly unlikely in European climates)

LAYING OUT CUT SLATES

When beginning or finishing with a cut piece of slate, the cut edge should be installed inward. The manufactured edge should be installed to the outside edge of the roof to maintain an acceptable roof appearance along the gable edge of the roof.

The centre mark of the slate can be used as a guide to cut 1 /2 slates. This can also be used as a guide to keep courses straight and to assist in maintaining the 6mm spacing when aligning with intermittent vertical chalk lines.

DO NOT install slates smaller than 76mm

PREPARATION

Inspect all areas of the roof surface to be covered.

1. Ensure the surface area is uniformly flat, smooth, sound, clean and free of irregularities.
2. Examine roof sheathing to verify that sheathing joints are supported by framing and blocking and / or metal clips.
3. Verify that substrate is sloped for drainage and completely anchored to sound framing. Any foreign particles shall be cleaned from interlocking areas to ensure proper seating and to prevent moisture intrusion. Proper provisions must be made for flashings and roof penetrations.
4. Metal flashing and other specialty flashings must be in place prior to the roof slate installation. Work by other trades which penetrate the roof plane must also be completed.
5. Product handling and storage on a flat surface is very important. Do not double stack pallets.

Installation

ROOF LAYOUT

1. The starting point may be from the left side, right side or centre of the area to be installed. 6mm spacer tabs are provided on every roof slate.

2. To create an eaves or starter slate, cut a full slate into 3 /4 size.

3. Locate the centre of the roof area to be covered.
From either end, position starter pieces and draw a horizontal line from the top of the starters between these two points. Next draw a vertical perpendicular line. This can be done easily by marking 0.91m along the eave, then where 1.22m and 1.52m intersect will form a perpendicular line. As long as the ratio 3:4:5 stays the same this will hold true, for example, 21:28:35

4. Begin by placing an eaves slate on the right and left side of the vertical line maintaining a 6mm spacing and continue to both ends overhang the eaves by a maximum of 50mm

5. Using a full slate, begin the first course, align centre locator line of the slate directly over the vertical blue chalk line. Adjust the roof slate up or down to align the exposure lines with the top edge of the lower course. Continue to both ends, maintaining the 6mm spacing between slates.

6. Fasten each Guardian Slate with two 30mm x 4mm head stainless steel screws. The fasteners should be placed within the two screw targets on each slate and must penetrate the boarding by at least 12mm.

7. Continue subsequent courses with a full standard slate, the finished edge facing the gable edge.

FELT AND BOARD ROOF

The following instructions are just a guide, and standard roofing procedures should be applied. Apart from the lightness and ease-of-use that Guardian Slate, there is very little difference between it and standard slate roof application. For felt and board roofs, start by fixing timber sheets to the rafters – over vapour permeable underlay. The first course and starter course should oversail the fascia by at least 50mm.

Fix starter course using a 3 /4 cut slate which can be easily cut to size from a full slate using a fine-toothed hand / circular saw or a sharp utility blade. As stated earlier, the first course and eaves (starter) course should oversail the fascia by at least 50mm. This ensures water disperses into the centre of the gutter.

The required gauge and number of courses can then be calculated. The first course should sit on top of an eaves course.

Lay the first course of full slates over the eaves course and fix to the sheet board. Ensure that the first course and eaves course are laid ‘broken bond’ so that the joints do not line up and the weatherproofing integrity is maintained. Lay subsequent courses ‘broken bond’ as illustrated. It will be necessary to cut to start and finish every other course.

RIDGE CAP FINISHING

Guardian ridge caps should be finished by cutting a standard slate at the end of the ridge into a triangle or diamond shape of the right size to cover the end gap. The resulting material should then be screwed in place into the truss. Alternatively, the material can be joined to the ridge cap by using a strong epoxy glue (adhering to the manufacturers instructions). The end piece can be sealed by using a good quality silicon sealant. Screw heads should be disguised with coloured sealant / paint.

HIP AND RIDGE DETAIL

When using pre-formed hip and ridge slates, place screw at fastener guide targets. Fasten hip slates with 2 screws (one on each side). Maintain a 152mm exposure.

Hip and ridge slate installation requires the slate to be screwed in place.

  • Draw a straight line in blue chalk by placing one piece of hip at the eave and one near the peak, draw the chalk line at the edge of the slate on the top and bottom pieces. This will help keep the hip straight in the event of a crooked hip.
  • If any screw heads are visible, cover with a coloured sealant or paint compatible with the roof slate.
  • Preformed ridge slates require 152mm exposure. Use 51mm length fasteners for the slate.
  • Fastener deck penetration must be a minimum of 19mm.
  • Ridge end closure can be made by cutting a triangular section from a slate and screwing to the timber fillet.

RIDGE-TO-HIP INTERSECTION

When a ridge tile meets hip tiles, it is necessary to weatherproof this intersection. A lead saddle should be fitted to cover the intersection between the ridge tile and the mitred hip tiles. Guardian slate hip tiles cut easily without splintering or cracking to create a tidy mitred joint.

 

Artificial Slate

Guardian Slate creates the effect of natural slate without the risk of cracking and breaking. They provide a smart alternative to traditional roof finishes that is lightweight, faster to install and cost effective.

The Ultimate Lightweight Slate Solution

Guardian Slate is an innovative roofing system featuring the aesthetic appeal of natural slate without the risk of cracking and breaking.

Today’s house builders and owners demand lower cost, faster and easier construction without compromising on quality while maintaining a traditional appearance.

Available in five natural colours

Guardian Slate is available in a choice of five natural colours, providing you the opportunity to add texture and style to your home.
The colours have been tested to high UV exposure and exhibit virtually no fade and with no trace of cracking or splitting.

Coverage - Each pack contains 22 slates per bundle

Roof Pitch Gauge Slates per sq.m
14* to 22.5 degrees (boarded only) 152mm 22
22.5 to 25 degrees (boarded or battens) 152mm 22
25 to 27.5 degrees (boarded or battens) 165mm 20
27.5 to 30 degrees (boarded or battens) 178mm 19
Above 30 degrees (boarded or battens) 191mm 18

 

Recycling
Guardian Slate is 100% recyclable, contact a local recycler to make the necessary arrangements, stating that the product is ‘mineral-filled Polypropylene’ plastic.

Fastener Recommendations
The Guardian Slate should be fastenened with two 30mm x 4mm head stainless steel screws.

Roof Decking Materials
Minimum of 12mm wpb plywood board, solid wood decking, or oriented strand board (OSB).

Roof Venting
Roof ventilation is necessary for the longevity of the roof system. Having a cool attic in the summer and a dry attic in the winter helps prevent damage to building materials and reduces energy consumption.

With a ventilation system split between the ridge and soffit, 0.09m2 of net free area is required for every 27.9m2 of attic floors space.

It is required to have 0.09m2 of ventilation for every 13.9m2 of attic floor space if this balance cannot be achieved.

Tools Required

  • Cordless drill or screwdriver
  • Sharp utility blade or standard circular saw
  • Tape measure
  • Pry bar
  • Tin snips
  • Blue chalk (do not use red chalk)

Product Information

Construction: Manufactured from resin bonded crushed limestone

Size:

  • Slate: 445 x 294mm
  • Ridge cap: 150 x 445mm

Weight:

  • Slate: 0.675 kgs (nominal)
  • Ridge cap: 0.620 kgs (nominal)

Ridge Coverage: 5.5 per linear metre

Hip Coverage: 5.5 to 6.5 per linear metre (depending on gauge)

Packaging: 22 slates per bundle (14.85 kg) / 1584 slates per pallet (1.04 tonne)

Roof Boarding: 12mm or standard roofing batten

Fixing: Two 30mm x 4mm head stainless steel screws

Cutting: Fine-toothed handsaw, jigsaw, circular saw, or sharp utility blade

Maximum pitch: 90 Degrees

Minimum pitch: 14 Degrees* (*Boarded Only)

Storage: Must be stored above 7°C for 24 hours before use. Can be installed at 0°C but must be hand fastened.

Warranty: Limited lifetime

Product Ratings and Certification

Hail rating: Class IV
Fire rating: A Rated to British Building Standards
Freeze-thaw cycle: No signs of damage or cracking after 300 cycles
Water absorption: No appreciable weight gain
Water permeation: Slate shown to be impermeable
Temperature cycling: No signs of cracking, curling, deformation, or visible expansion
BBA product certification: Pending

When do you dispatch orders?

If your order is placed before 12pm we aim to have these processed and dispatched on that same day. However some items have an earlier cut off time and will be dispatched the following day. 

How much will my delivery cost?

Our delivery costs vary depending on what product is ordered and where it is being delivered to. When you add items to your basket and proceed to checkout the delivery prices will be stated. We keep our delivery costs as low as possible and only pass on the rates that our delivery partners charge us.

How long will my delivery take?

On the product page you will see our usual lead time for our items, these are above the ADD TO BASKET button. These are a guide only and we aim to get your items delivered to you ASAP.

SPACING BETWEEN THE SLATES

To aid consistent spacing, 6mm spacer tabs are provided on each side of every slate.

The spacers allow for any movement of the roof deck and expansion / contraction of the slate (although thermal expansion is highly unlikely in European climates)

LAYING OUT CUT SLATES

When beginning or finishing with a cut piece of slate, the cut edge should be installed inward. The manufactured edge should be installed to the outside edge of the roof to maintain an acceptable roof appearance along the gable edge of the roof.

The centre mark of the slate can be used as a guide to cut 1 /2 slates. This can also be used as a guide to keep courses straight and to assist in maintaining the 6mm spacing when aligning with intermittent vertical chalk lines.

DO NOT install slates smaller than 76mm

PREPARATION

Inspect all areas of the roof surface to be covered.

1. Ensure the surface area is uniformly flat, smooth, sound, clean and free of irregularities.
2. Examine roof sheathing to verify that sheathing joints are supported by framing and blocking and / or metal clips.
3. Verify that substrate is sloped for drainage and completely anchored to sound framing. Any foreign particles shall be cleaned from interlocking areas to ensure proper seating and to prevent moisture intrusion. Proper provisions must be made for flashings and roof penetrations.
4. Metal flashing and other specialty flashings must be in place prior to the roof slate installation. Work by other trades which penetrate the roof plane must also be completed.
5. Product handling and storage on a flat surface is very important. Do not double stack pallets.

Installation

ROOF LAYOUT

1. The starting point may be from the left side, right side or centre of the area to be installed. 6mm spacer tabs are provided on every roof slate.

2. To create an eaves or starter slate, cut a full slate into 3 /4 size.

3. Locate the centre of the roof area to be covered.
From either end, position starter pieces and draw a horizontal line from the top of the starters between these two points. Next draw a vertical perpendicular line. This can be done easily by marking 0.91m along the eave, then where 1.22m and 1.52m intersect will form a perpendicular line. As long as the ratio 3:4:5 stays the same this will hold true, for example, 21:28:35

4. Begin by placing an eaves slate on the right and left side of the vertical line maintaining a 6mm spacing and continue to both ends overhang the eaves by a maximum of 50mm

5. Using a full slate, begin the first course, align centre locator line of the slate directly over the vertical blue chalk line. Adjust the roof slate up or down to align the exposure lines with the top edge of the lower course. Continue to both ends, maintaining the 6mm spacing between slates.

6. Fasten each Guardian Slate with two 30mm x 4mm head stainless steel screws. The fasteners should be placed within the two screw targets on each slate and must penetrate the boarding by at least 12mm.

7. Continue subsequent courses with a full standard slate, the finished edge facing the gable edge.

FELT AND BOARD ROOF

The following instructions are just a guide, and standard roofing procedures should be applied. Apart from the lightness and ease-of-use that Guardian Slate, there is very little difference between it and standard slate roof application. For felt and board roofs, start by fixing timber sheets to the rafters – over vapour permeable underlay. The first course and starter course should oversail the fascia by at least 50mm.

Fix starter course using a 3 /4 cut slate which can be easily cut to size from a full slate using a fine-toothed hand / circular saw or a sharp utility blade. As stated earlier, the first course and eaves (starter) course should oversail the fascia by at least 50mm. This ensures water disperses into the centre of the gutter.

The required gauge and number of courses can then be calculated. The first course should sit on top of an eaves course.

Lay the first course of full slates over the eaves course and fix to the sheet board. Ensure that the first course and eaves course are laid ‘broken bond’ so that the joints do not line up and the weatherproofing integrity is maintained. Lay subsequent courses ‘broken bond’ as illustrated. It will be necessary to cut to start and finish every other course.

RIDGE CAP FINISHING

Guardian ridge caps should be finished by cutting a standard slate at the end of the ridge into a triangle or diamond shape of the right size to cover the end gap. The resulting material should then be screwed in place into the truss. Alternatively, the material can be joined to the ridge cap by using a strong epoxy glue (adhering to the manufacturers instructions). The end piece can be sealed by using a good quality silicon sealant. Screw heads should be disguised with coloured sealant / paint.

HIP AND RIDGE DETAIL

When using pre-formed hip and ridge slates, place screw at fastener guide targets. Fasten hip slates with 2 screws (one on each side). Maintain a 152mm exposure.

Hip and ridge slate installation requires the slate to be screwed in place.

  • Draw a straight line in blue chalk by placing one piece of hip at the eave and one near the peak, draw the chalk line at the edge of the slate on the top and bottom pieces. This will help keep the hip straight in the event of a crooked hip.
  • If any screw heads are visible, cover with a coloured sealant or paint compatible with the roof slate.
  • Preformed ridge slates require 152mm exposure. Use 51mm length fasteners for the slate.
  • Fastener deck penetration must be a minimum of 19mm.
  • Ridge end closure can be made by cutting a triangular section from a slate and screwing to the timber fillet.

RIDGE-TO-HIP INTERSECTION

When a ridge tile meets hip tiles, it is necessary to weatherproof this intersection. A lead saddle should be fitted to cover the intersection between the ridge tile and the mitred hip tiles. Guardian slate hip tiles cut easily without splintering or cracking to create a tidy mitred joint.


 

Get a Quote

Planning your next project and need cost assistance. We help projects of all sizes and offer money-saving alternatives and discounts for large orders. We strive to respond within 24 hours.
 

Get a quote for your next project

 
 

Related Products

Product you might also like...

 
Artificial Slate Roof Tiles
1050030015
0.675kg

CALCULATORS DIVIDER

 
Fixings.webp

UKFR - ROOFING AND INSULATION SPECIALISTS

Fixings Calculator

Effortlessly secure your warm roof deck with the correct size thermally broken fixings using our intuitive calculator! Simply input your deck type, insulation thickness, and top deck thickness (if applicable) and the calculator will add the compatible size tube and screw combination to your basket. It is crucial to use the correct warm deck insulation fixings so ensure lasting roof durability by using our simple calculator today!

Fixings.webp

UKFR - ROOFING AND INSULATION SPECIALISTS

Fixings Calculator

Effortlessly secure your warm roof deck with the correct size thermally broken fixings using our intuitive calculator! Simply input your deck type, insulation thickness, and top deck thickness (if applicable) and the calculator will add the compatible size tube and screw combination to your basket. It is crucial to use the correct warm deck insulation fixings so ensure lasting roof durability by using our simple calculator today!

ClassicBond EPDM Roofing.png

UKFR - ROOFING AND INSULATION SPECIALISTS

ClassicBond Calculator

EPDM Rubber Roofing has never been easier! Simply enter your roof dimensions, deck type, and roof edges, and the calculator will add all necessary materials for installing your ClassicBond EPDM rubber roof to your basket.

Experience simplicity with our ClassicBond Calculator today!

ClassicBond EPDM Roofing.png

UKFR - ROOFING AND INSULATION SPECIALISTS

ClassicBond Calculator

EPDM Rubber Roofing has never been easier! Simply enter your roof dimensions, deck type, and roof edges, and the calculator will add all necessary materials for installing your ClassicBond EPDM rubber roof to your basket.

Experience simplicity with our ClassicBond Calculator today!

resize.webp

UKFR - ROOFING AND INSULATION SPECIALISTS

SkyGuard Calculator

SkyGuard Shed Roofing has never been easier!

Our innovative shed roof calculator will automatically add the required quantity of materials to your basket - simply enter your roof dimensions, select your edges and trim preferences and add to basket.

Simplify your DIY with the SkyGuard Shed Roof Calculator today!

resize.webp

UKFR - ROOFING AND INSULATION SPECIALISTS

SkyGuard Calculator

SkyGuard Shed Roofing has never been easier!

Our innovative shed roof calculator will automatically add the required quantity of materials to your basket - simply enter your roof dimensions, select your edges and trim preferences and add to basket.

Simplify your DIY with the SkyGuard Shed Roof Calculator today!

 

Start - SkyGuard Calc

Enter your roof size

Please enter the exact edge dimensions - we will add an allowance for an overhang.

 

Form fields

Next Step

Select your trims

Please make your selection from the options below.

Form fields

Next Step

Select your trim type

Please make your selection from the options below.

Form fields

End - SkyGuard Calc

Enter your roof size

Please enter the exact edge dimensions - we will add an allowance for an overhang.

 

Form fields

Next Step

Select your roof deck type

Please make your selection from the options below.

Form fields

Next Step

Select your trims

Please make your selection from the options below.

Form fields

Next Step

Select your trim colour

Please make your selection from the options below.

Form fields

Next Step

Add options & upgrades

Please make your selection from the options below.

Form fields

 

Artificial Slate

Guardian Slate creates the effect of natural slate without the risk of cracking and breaking. They provide a smart alternative to traditional roof finishes that is lightweight, faster to install and cost effective.

The Ultimate Lightweight Slate Solution

Guardian Slate is an innovative roofing system featuring the aesthetic appeal of natural slate without the risk of cracking and breaking.

Today’s house builders and owners demand lower cost, faster and easier construction without compromising on quality while maintaining a traditional appearance.

Available in five natural colours

Guardian Slate is available in a choice of five natural colours, providing you the opportunity to add texture and style to your home.
The colours have been tested to high UV exposure and exhibit virtually no fade and with no trace of cracking or splitting.

Coverage - Each pack contains 22 slates per bundle

Roof Pitch Gauge Slates per sq.m
14* to 22.5 degrees (boarded only) 152mm 22
22.5 to 25 degrees (boarded or battens) 152mm 22
25 to 27.5 degrees (boarded or battens) 165mm 20
27.5 to 30 degrees (boarded or battens) 178mm 19
Above 30 degrees (boarded or battens) 191mm 18

 

Recycling
Guardian Slate is 100% recyclable, contact a local recycler to make the necessary arrangements, stating that the product is ‘mineral-filled Polypropylene’ plastic.

Fastener Recommendations
The Guardian Slate should be fastenened with two 30mm x 4mm head stainless steel screws.

Roof Decking Materials
Minimum of 12mm wpb plywood board, solid wood decking, or oriented strand board (OSB).

Roof Venting
Roof ventilation is necessary for the longevity of the roof system. Having a cool attic in the summer and a dry attic in the winter helps prevent damage to building materials and reduces energy consumption.

With a ventilation system split between the ridge and soffit, 0.09m2 of net free area is required for every 27.9m2 of attic floors space.

It is required to have 0.09m2 of ventilation for every 13.9m2 of attic floor space if this balance cannot be achieved.

Tools Required

  • Cordless drill or screwdriver
  • Sharp utility blade or standard circular saw
  • Tape measure
  • Pry bar
  • Tin snips
  • Blue chalk (do not use red chalk)

Product Information

Construction: Manufactured from resin bonded crushed limestone

Size:

  • Slate: 445 x 294mm
  • Ridge cap: 150 x 445mm

Weight:

  • Slate: 0.675 kgs (nominal)
  • Ridge cap: 0.620 kgs (nominal)

Ridge Coverage: 5.5 per linear metre

Hip Coverage: 5.5 to 6.5 per linear metre (depending on gauge)

Packaging: 22 slates per bundle (14.85 kg) / 1584 slates per pallet (1.04 tonne)

Roof Boarding: 12mm or standard roofing batten

Fixing: Two 30mm x 4mm head stainless steel screws

Cutting: Fine-toothed handsaw, jigsaw, circular saw, or sharp utility blade

Maximum pitch: 90 Degrees

Minimum pitch: 14 Degrees* (*Boarded Only)

Storage: Must be stored above 7°C for 24 hours before use. Can be installed at 0°C but must be hand fastened.

Warranty: Limited lifetime

Product Ratings and Certification

Hail rating: Class IV
Fire rating: A Rated to British Building Standards
Freeze-thaw cycle: No signs of damage or cracking after 300 cycles
Water absorption: No appreciable weight gain
Water permeation: Slate shown to be impermeable
Temperature cycling: No signs of cracking, curling, deformation, or visible expansion
BBA product certification: Pending

When do you dispatch orders?

If your order is placed before 12pm we aim to have these processed and dispatched on that same day. However some items have an earlier cut off time and will be dispatched the following day. 

How much will my delivery cost?

Our delivery costs vary depending on what product is ordered and where it is being delivered to. When you add items to your basket and proceed to checkout the delivery prices will be stated. We keep our delivery costs as low as possible and only pass on the rates that our delivery partners charge us.

How long will my delivery take?

On the product page you will see our usual lead time for our items, these are above the ADD TO BASKET button. These are a guide only and we aim to get your items delivered to you ASAP.

SPACING BETWEEN THE SLATES

To aid consistent spacing, 6mm spacer tabs are provided on each side of every slate.

The spacers allow for any movement of the roof deck and expansion / contraction of the slate (although thermal expansion is highly unlikely in European climates)

LAYING OUT CUT SLATES

When beginning or finishing with a cut piece of slate, the cut edge should be installed inward. The manufactured edge should be installed to the outside edge of the roof to maintain an acceptable roof appearance along the gable edge of the roof.

The centre mark of the slate can be used as a guide to cut 1 /2 slates. This can also be used as a guide to keep courses straight and to assist in maintaining the 6mm spacing when aligning with intermittent vertical chalk lines.

DO NOT install slates smaller than 76mm

PREPARATION

Inspect all areas of the roof surface to be covered.

1. Ensure the surface area is uniformly flat, smooth, sound, clean and free of irregularities.
2. Examine roof sheathing to verify that sheathing joints are supported by framing and blocking and / or metal clips.
3. Verify that substrate is sloped for drainage and completely anchored to sound framing. Any foreign particles shall be cleaned from interlocking areas to ensure proper seating and to prevent moisture intrusion. Proper provisions must be made for flashings and roof penetrations.
4. Metal flashing and other specialty flashings must be in place prior to the roof slate installation. Work by other trades which penetrate the roof plane must also be completed.
5. Product handling and storage on a flat surface is very important. Do not double stack pallets.

Installation

ROOF LAYOUT

1. The starting point may be from the left side, right side or centre of the area to be installed. 6mm spacer tabs are provided on every roof slate.

2. To create an eaves or starter slate, cut a full slate into 3 /4 size.

3. Locate the centre of the roof area to be covered.
From either end, position starter pieces and draw a horizontal line from the top of the starters between these two points. Next draw a vertical perpendicular line. This can be done easily by marking 0.91m along the eave, then where 1.22m and 1.52m intersect will form a perpendicular line. As long as the ratio 3:4:5 stays the same this will hold true, for example, 21:28:35

4. Begin by placing an eaves slate on the right and left side of the vertical line maintaining a 6mm spacing and continue to both ends overhang the eaves by a maximum of 50mm

5. Using a full slate, begin the first course, align centre locator line of the slate directly over the vertical blue chalk line. Adjust the roof slate up or down to align the exposure lines with the top edge of the lower course. Continue to both ends, maintaining the 6mm spacing between slates.

6. Fasten each Guardian Slate with two 30mm x 4mm head stainless steel screws. The fasteners should be placed within the two screw targets on each slate and must penetrate the boarding by at least 12mm.

7. Continue subsequent courses with a full standard slate, the finished edge facing the gable edge.

FELT AND BOARD ROOF

The following instructions are just a guide, and standard roofing procedures should be applied. Apart from the lightness and ease-of-use that Guardian Slate, there is very little difference between it and standard slate roof application. For felt and board roofs, start by fixing timber sheets to the rafters – over vapour permeable underlay. The first course and starter course should oversail the fascia by at least 50mm.

Fix starter course using a 3 /4 cut slate which can be easily cut to size from a full slate using a fine-toothed hand / circular saw or a sharp utility blade. As stated earlier, the first course and eaves (starter) course should oversail the fascia by at least 50mm. This ensures water disperses into the centre of the gutter.

The required gauge and number of courses can then be calculated. The first course should sit on top of an eaves course.

Lay the first course of full slates over the eaves course and fix to the sheet board. Ensure that the first course and eaves course are laid ‘broken bond’ so that the joints do not line up and the weatherproofing integrity is maintained. Lay subsequent courses ‘broken bond’ as illustrated. It will be necessary to cut to start and finish every other course.

RIDGE CAP FINISHING

Guardian ridge caps should be finished by cutting a standard slate at the end of the ridge into a triangle or diamond shape of the right size to cover the end gap. The resulting material should then be screwed in place into the truss. Alternatively, the material can be joined to the ridge cap by using a strong epoxy glue (adhering to the manufacturers instructions). The end piece can be sealed by using a good quality silicon sealant. Screw heads should be disguised with coloured sealant / paint.

HIP AND RIDGE DETAIL

When using pre-formed hip and ridge slates, place screw at fastener guide targets. Fasten hip slates with 2 screws (one on each side). Maintain a 152mm exposure.

Hip and ridge slate installation requires the slate to be screwed in place.

  • Draw a straight line in blue chalk by placing one piece of hip at the eave and one near the peak, draw the chalk line at the edge of the slate on the top and bottom pieces. This will help keep the hip straight in the event of a crooked hip.
  • If any screw heads are visible, cover with a coloured sealant or paint compatible with the roof slate.
  • Preformed ridge slates require 152mm exposure. Use 51mm length fasteners for the slate.
  • Fastener deck penetration must be a minimum of 19mm.
  • Ridge end closure can be made by cutting a triangular section from a slate and screwing to the timber fillet.

RIDGE-TO-HIP INTERSECTION

When a ridge tile meets hip tiles, it is necessary to weatherproof this intersection. A lead saddle should be fitted to cover the intersection between the ridge tile and the mitred hip tiles. Guardian slate hip tiles cut easily without splintering or cracking to create a tidy mitred joint.

 

£41.99